Stability of protecting breakwaters Port 2000 breakwater in wave basin
Client: GTM Construction - Scale: 1/45
Checking of stability and overtopping on the alternative proposed by the consortium, both during the works phase and following completion of the breakwaters
Detailed study of stability of the join between the breakwater and the caisson roundhead
Stability of the dike - caisson roundhead connection
Completed development
Stability of artificial island
Client : Port of Le Havre Authority - Scales: 1/20 (2D) - 1/40 (3D)
Stability study of an artificial island intended to be a nature reserve for birds and seals. Created as part of environmental mitigating measures accompanying the Port 2000 port extension works.
Stability of the island coastal protection in wave flume
Tests in wave basin of the artificial island coastal protection
Tests in wave flume (2D) of a trunk section, then in wave basin (3D) of the entire structure