Client: ILK Construction - Scale: 1/39 3D model before tests series
Construction of a harbour in the Caspian Sea comprising two breakwaters protected by ACCROPODE™ I blocks measuring 1 to 2.5 m3. Wave tank stability study (scale 1:39) of the main 900 m long jetty and the 350 m long secondary breakwater. Examination of wave disturbance inside the harbour basin.